Press Releases
February 12, 2015, EDMONTON, ALBERTA. Athabasca Minerals Inc. (“Athabasca” or the “Corporation”) (TSX Venture: ABM) is pleased to announce the completion of a Preliminary Economic Assessment (“PEA”), effective date November 26, 2014, for the Corporation’s Firebag Silica Sand Project (“Firebag Project”) located approximately 95 kilometres (“km”) north of Fort McMurray Alberta.
The PEA shows that the Firebag Project has considerable potential for development as a frac sand resource, which includes the potential for a large, highly economical deposit with high margin, rapid payback and 25 years of open pit mining.
The PEA has been prepared by Mr. Ted Hannah, P. Geo., and Ms. Theresa Lavender, P. Eng., of Norwest Corporation (“Norwest”), headquartered in Calgary, Alberta; qualified persons as defined under National Instrument 43-101 (“NI 43-101″). A full copy of the PEA will be available at www.sedar.com and on the Corporation’s website at www.athabascaminerals.com within 45 days of this press release.
PEA Highlights:
Dom Kriangkum, President and CEO of Athabasca stated “We are very pleased with the results of this Preliminary Economic Assessment as prepared by Norwest. This study outlines the high economic return and technical viability of the Firebag Project. The PEA confirms Athabasca’s initial work and supports a high value, high margin and low risk frac sand project in Alberta. Completion of the PEA marks a major milestone for Athabasca in becoming a frac sand supplier in Canada. The significant savings in transportation costs compared to existing imported sands should provide Athabasca a major competitive advantage. We are still on target to be in production by 2016″
PEA Summary of Results
Description | Units | Quantity |
Silica Sand In-Situ Inferred Resource(1)(2) | Tonnes | 39,244,000 |
Silica Sand Run of mine (“ROM”) Inferred Resource(1)(2) | Tonnes | 24,642,450 |
Frac Sand Product (Clean)(20/40 mesh)(1)(2) | Tonnes | 2,919,730 |
Frac Sand Product (Clean)(40/70 mesh)(1)(2) | Tonnes | 12,273,330 |
Frac Sand Product (Clean)(70/140 mesh)(1)(2) | Tonnes | 7,534,590 |
Total Frac Sand Products(1)(2) | Tonnes | 22,727,650 |
Rejects | Tonnes | 1,914,800 |
Waste/Reclamation | Tonnes | 1,446,450 |
Mine life | Years | 25 |
Production — Year 1 | Tonnes | 300,848 |
Peak Production | Tonnes | 921,588 |
Average Production in 25 Years | Tonnes | 897,072 |
Total Initial Capital Cost (including 20% contingency) | $Cdn | 87,811,862 |
Sustaining Capital Cost (including 20% contingency) (primarily composed of reclamation accruals and rail car leasing) | $Cdn | 121,149,560 |
Total Life of Mine Capital Cost (including 20% contingency) | $Cdn | 208,961,422 |
Total Life of Mine Operating Cost | $Cdn | 2,496,610,427 |
Total Life of Mine Revenue | $Cdn | 3,823,675,305 |
Total life of Mine Operating Cash Flow before Income Tax | $Cdn | 1,312,973,734 |
Total Life of Mine Income Tax | $Cdn | 278,551,756 |
Total life of Mine Operating Cash Flow After Income Tax | $Cdn | 1,034,421,978 |
Total life of Mine Net Cash Flow After Income Tax | $Cdn | 825,460,557 |
Before-Tax Net Present Value at 10% Discount Rate | $Cdn | 368,306,000 |
Before-Tax Internal rate of Return | % | 68 |
Before-Tax Pay Back | Years | 1.6 |
After-Tax Net Present Value at 10% Discount Rate | $Cdn | 268,342,000 |
After-Tax Internal rate of Return | % | 57 |
After-Tax Pay Back | Years | 1.9 |
Notes:
The PEA is preliminary in nature and includes inferred mineral resources that are considered to be too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the forecast results stated in the PEA will be realized.
Frac sand Selling Price and Distribution
Frac sand (Mesh) | Base Case Selling Price* ($Cdn/cmt) | Product Distribution (%) |
20/40 Mesh | $195 | 13 |
40/70 Mesh | $170 | 54 |
70/140 Mesh | $155 | 33 |
Note*: Frac Sand Product Pricing from Q3 2014
Sensitivities:
Sensitivity analyses were carried out to determine how changes in certain key parameters would impact the economic performance of the Firebag Project. The following assumptions were examined where the product prices were 10%, 20% and 30% above and below the base case prices:
30% | 20% | 10% | Base Case | -10% | -20% | -30% | ||
Before-Tax Net PresentValue at 10% Discount Rate | $Cdn | 799,400,000 | 655,702,000 | 512,004,000 | 368,306,000 | 224,608,000 | 80,910,000 | -62,788,000 |
Before-Tax InternalRate of Return | % | 167% | 128% | 96% | 68% | 43% | 22% | -4% |
After-Tax Net PresentValue at 10% Discount Rate | $Cdn | 592,395,000 | 484,498,000 | 376,602,000 | 268,342,000 | 159,939,000 | 50,218,000 | -68,094,000 |
After-Tax InternalRate of Return | % | 136% | 106% | 81% | 57% | 37% | 18% | -7% |
The Firebag Silica Sand Project
The Firebag Project is part of the Corporation’s Firebag Property which comprises seven contiguous Alberta Metallic and Industrial Minerals Leases totalling 32,565 acres, and four Alberta Public Land Dispositions totalling 542 acres, of which Athabasca Minerals holds a 100% working interest.
Project Description
The Firebag Project is composed of three components; the mine site where the raw silica sand is mined, the Lynton trans-loading area in Fort McMurray, and an offload and processing site in the Edson/Hinton area, where the ROM silica sand will be processed to produce a marketable sand product.
The mine site has been designed to produce approximately 1 million tonnes of ROM silica sand per annum over a project life of 25 years. Prior to mining the area the site will be cleared of timber and other vegetation. All topsoil will be salvaged with indicative depths less than 0.5 m and placed in stockpiles during the initial years of mine development. Progressive reclamation will allow the salvaged soil to be placed directly on reclaimed areas. Minimal waste sand is encountered during the mining process. A small hydraulic excavator will load 23 tonne articulated dump trucks which will haul the ROM sand to an out-of-pit stockpile area. The mined pit will be approximately 16 m in depth. The ROM sand will be loaded by a front-end loader onto highway trucks for transport to the Lynton facility.
Lynton, Alberta is located approximately 15 km east of Fort McMurray along Highway 69. Athabasca has secured a 180 acres parcel immediately adjacent to the existing Canadian National Rail Company (“CN”) Lynton Rail Yard. This is the terminus for the CN rail in the Fort McMurray Area. Athabasca’s private trans-loading Lynton facility will receive the ROM silica sand from the mine site via contract highway haulers. The sand will be stockpiled and loaded onto the rail cars.
For the purposes of the PEA, Athabasca has determined that the Edson/Hinton site, located in west-central Alberta, will be the location of the process facility and the point of sale for the marketable frac sand. The processed sand will be separated into the three product sizes (20/40 mesh, 40/70 mesh, and 70/140 mesh). The sized material will be stored in respective product bins until the time of sale.
Conclusions
The PEA completed by Norwest shows that the Firebag Project has considerable potential for development as a frac sand resource. This is based on the following observations:
Tenure
Quantity of the Firebag Property Deposit
Access to Rail Structure
Local Mining Support
Market
Economics
Cautionary Statement
For the geological section of the PEA, Norwest reviewed the “National Instrument 43-101 Technical Report, Inferred Frac Sand Estimate for the Firebag Property, Northeastern Alberta, Canada (September 19, 2014)” produced by APEX Geoscience Ltd. The report was deemed representative of the current status of the Firebag Project with respect to the known geology, exploration work done to date, and interpretation of the results with an accepted level of the confidence for the resource calculations.
The reader is advised that the PEA summarized in this press release is only intended to provide an initial, high level review of the project. The accuracy of resource estimates is, in part, a function of the quality and quantity of available data and of engineering and geological interpretation and judgement. Given the data available at the time of this report was prepared, the estimates presented herein are considered reasonable. However, they should be accepted with the understanding that additional data and analysis available subsequent to the date of the estimates may necessitate revision. These revisions may be material. There is no guarantee that all or any part of the estimated resources will be recoverable and there is no certainty that the PEA will be realized.
Qualified Persons
Ms. Theresa Lavender, P. Eng. is a professional engineer. Ms. Lavender is currently employed as Manager by Norwest Corporation. Ms. Lavender has a BSc. in Mining Engineering and has worked as a mining engineer for 15 years since graduation from university. Ms. Lavender’s work experience includes 5 years of employment at various surface mining operations in Western Canada. Ms. Lavender is acting as the Qualified Person, as defined in NI 43-101 for portions of this PEA. Ms. Lavender is responsible for the technical content of this release and has reviewed and approved it accordingly. Ms. Lavender and Norwest are independent of Athabasca under NI 43-101.
Mr. Ted Hannah, P. Geo., is a professional geologist. He is currently employed as Vice President Geology by Norwest Corporation. Mr. Hannah has a BSc. in Geology and has worked as a geologist for a total of 41 years since graduation from university. Mr. Hannah’s work experience includes thirty nine years of exploration and mining support on variety of coal, oilsands and other sedimentary projects around the world. Mr. Hannah is acting as the Qualified Person, as defined in NI 43-101 for portions of this PEA. Mr. Hannah is responsible for the technical content of this release and has reviewed and approved it accordingly. Mr. Hannah and Norwest are independent of Athabasca under NI 43-101.
About Norwest Corporation
Norwest Corporation is an internationally-recognized leader in providing consulting expertise to the energy, mining, and natural resources industries. For over 30 years Norwest has offered a wide range of services to energy and mining companies, electric power producers, financial institutions, governments, legal firms, and regulatory agencies. Norwest’s professional staff of engineers, hydrologists, geologists, environmental specialists and management consultants brings extensive industry experience to our consulting projects. Norwest’s innovative, experienced-based approach is focused on assisting its clients achieve world-class performance standards.
About Athabasca Minerals
The Corporation is a resource company involved in the management, exploration and development of aggregate and silica sand projects. These activities include contracts works, aggregate pit management, aggregate production and sales from corporate-owned pits, new aggregate development and acquisitions of sand and gravel operations, and development and supply of frac sand for Western Canada. The Corporation also has industrial mineral land holdings for the purpose of locating and developing sources of industrial minerals and aggregates essential to high growth economic development.
For further Information on Athabasca, please contact:
Dean Stuart
T: 403- 517-2270
E: dean@boardmarker.net
IBF3