Press Release
TORONTO, April 02, 2024 — Talisker Resources Ltd. (“ Talisker ” or the “ Company ”) (TSX:TSK | OTCQX:TSKFF) is pleased to announce additional high-grade drill results highlighted by 38.17 g/t Au over 5.20 metres at its 100% owned flagship Bralorne Gold Project.
Key Points:
SB-2024-008A Hole Description
SB-2024-011 Hole Description
Major vein structures intersected are considered classic Bralorne crack-seal quartz-carbonate veins with densely banded sulphide septae. Crack-seal septae host fine-grained arsenopyrite and pyrite mineralization. Alteration halos consist of strong silica-sericite±mariposite alteration halos.
Bralorne Gold Project | ||||||
Drill Hole SB-2024-008A and 2024-011 | ||||||
Drill Hole Name | From (m) |
To (m) |
Interval (m) |
Au (g/t) |
Interpreted Structure | |
SB-2024-008A | 176.3 | 176.8 | 0.5 | 45.70 | Alhambra Vein | |
SB-2024-008A | 176.8 | 177.3 | 0.5 | 336.00 | ||
SB-2024-008A | 177.3 | 177.8 | 0.5 | 5.71 | Vein Halo | |
SB-2024-008A | 177.8 | 178.3 | 0.5 | 2.19 | ||
SB-2024-008A | 178.3 | 179 | 0.7 | 1.18 | ||
SB-2024-008A | 179 | 180 | 1 | 1.78 | ||
SB-2024-008A | 180 | 181 | 1 | 0.99 | ||
SB-2024-011 | 203.35 | 203.85 | 0.5 | 4.57 | Vein Halo | |
SB-2024-011 | 203.85 | 204.35 | 0.5 | 5.33 | ||
SB-2024-011 | 204.35 | 205.35 | 1 | 2.19 | ||
SB-2024-011 | 205.35 | 206.5 | 1.15 | 0.99 | ||
SB-2024-011 | 206.5 | 207.5 | 1 | 3.23 | ||
SB-2024-011 | 207.5 | 208 | 0.5 | 1.85 | ||
SB-2024-011 | 208 | 208.5 | 0.5 | 1.98 | ||
SB-2024-011 | 208.5 | 209.6 | 1.1 | 2.54 | BK-9870 Vein | |
SB-2024-011 | 209.6 | 211 | 1.4 | 11.35 | ||
SB-2024-011 | 211 | 211.5 | 0.5 | 4.62 | ||
Notes: Diamond drill hole SB-2024-008A has a collar orientation of Azimuth 357.5; Dip -57. Diamond drill hole SB-2024-011 has a collar orientation of Azimuth 218.5; Dip -45.5. True widths are estimated at 40 – 90% of intercept lengths and are based on oriented core measurements where available. Method Reported includes the most up-to-date information as of the date of this press release |
All reported drill assay results are available on the Company’s website.
For further information, please contact:
Terry Harbort President and CEO terry.harbort@taliskerresources.com +1 416 357 0227 |
Matt Filgate Vice President, Corporate Development matt.filgate@taliskerresources.com +1 778 679 3579 |
Qualified Person
The technical information contained in this news release relating to the drill results at the Bralorne Gold Project has been approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker’s Vice President, Exploration and Resource Development, who is a “qualified person” within the meaning of National Instrument 43-101, Standards of Disclosure for Mineral Projects.
About Talisker Resources Ltd.
Talisker (taliskerresources.com) is a junior resource company involved in the exploration and development of gold projects in British Columbia, Canada. Talisker’s flagship asset is the high-grade, fully permitted Bralorne Gold Project where the Company is currently transitioning into underground production at the Mustang Mine. Talisker projects also include the Ladner Gold Project, an advanced stage project with significant exploration potential from an historical high-grade producing gold mine and the Spences Bridge Project where the Company holds ~85% of the emerging Spences Bridge Gold Belt, and several other early-stage Greenfields projects.
IBF4