Follow Us! Like Our Page!

Comstock Advances Preview SW Gold Project Drilling 23.6 m Averaging 3.60 g/t Gold

Press Release

Vancouver, BC – January 31, 2019 – Comstock Metals Ltd. (TSX-V: CSL) (“Comstock” or the “Company“) is pleased to report the results from the winter diamond drilling program at its 100% owned Preview SW gold project, located 40 km northeast of La Ronge, Saskatchewan. These results are from 5 NQ diameter drill holes, totalling 810 metres, completed at the Preview North zone (“Preview North”).

  • 6 m averaging 3.60 g/t gold in PR18-187 starting at 50.40 m down hole and including 2.10 m averaging 13.85 g/t gold starting at 64.40 m down hole
  • 00 m averaging 7.47 g/t gold in PR18-187 starting at 31.00 m down hole and including 0.75 m averaging 74.6 g/t gold starting at 33.00 m down hole
  • 20 m averaging 5.30 g/t gold in PR18-183 starting at 113.80 m down hole and including 3.30 m averaging 8.04 g/t gold starting at 115.70 m down hole
  • 50 m averaging 2.87 g/t gold in PR18-185 starting at 23.00 m down hole and including 3.25 m averaging 10.35 g/t gold starting at 36.75 m down hole

Read More: http://www.comstock-metals.com/2019/01/31/comstock-advances-preview-sw-gold-project-drilling-23-6-m-averaging-3-60-g-t-gold/

IBF5

Loading

NationTalk Partners & Sponsors Learn More