TORONTO, March 27, 2026 — Hudbay Minerals Inc. (“Hudbay” or the “Company”) (TSX, NYSE: HBM) today released its annual mineral reserve and resource update and issued new three-year production guidance. All amounts are in U.S. dollars, unless otherwise noted.
“Our updated mineral reserve estimates and three-year production outlook demonstrate Hudbay’s continued success from our exploration initiatives and an improved copper and gold production profile from our three long life operations in tier one mining jurisdictions in the Americas,” said Peter Kukielski, Hudbay’s President and Chief Executive Officer. “With our newly released guidance through 2028, consolidated copper production is expected to increase by 24%, complemented by continued strong gold exposure. This growth is underpinned by meaningful mine life extensions at Snow Lake and Copper Mountain reinforcing the longevity and upside of our operating base. As we embark on generational reinvestments across our business in exploration and brownfield growth opportunities, continue to advance Copper World toward a sanctioning decision in 2026, and integrate the Cactus project through the strategic acquisition of Arizona Sonoran, Hudbay is in an optimal position to deliver attractive high-return growth, significantly increase long-term copper exposure and unlock meaningful value for stakeholders.”
Constancia Operations
Constancia is Hudbay’s 100% owned copper operation located in the province of Chumbivilcas in southern Peru. The Pampacancha high-grade satellite deposit was mined between 2021 and 2025 and provided a significant source of higher-grade mill feed in recent years until mining activities were completed in the fourth quarter of 2025.
Current mineral reserve estimates total 488 million tonnes at 0.24% copper containing approximately 1.2 million tonnes of copper, after deducting 2025 mining depletion. The expected mine life of Constancia is now until 2040 as mill throughput rates are expected to increase to more than 90,000 tonnes per day starting in the second half of 2026 with the installation of two pebble crushers and related permit amendments. These initiatives are intended to optimize the utilization of existing infrastructure and support improved long-term operating performance.
In 2025, Hudbay optimized the mine plan during a period of social unrest by prioritizing Pampacancha mining activities and supplementing mill ore feed from low-grade stockpiles. Following the accelerated depletion of Pampacancha, mining activities at Pampacancha were completed in the fourth quarter of 2025. The remaining stockpiled Pampacancha ore was fully processed in early 2026 and the Company is now exclusively mining and processing ore from the Constancia deposit.
Annual production at the Constancia operations is expected to average approximately 87,500i tonnes of copper and 18,500i ounces of gold over the next three years. This reflects steady copper production levels as higher mill throughput is expected to offset lower grades starting in 2026 after the completion of mining at Pampacancha in late 2025.