Press Release
Thunder Bay, February 25, 2019 – Premier Gold Mines Limited (“Premier” or “The Company”) (TSX:PG) is pleased to provide mineral reserves and resources (MRMR) as of December 31, 2018 including updated statements from the Mercedes Mine (100%-owned) and South Arturo Property (40%-owned). All tables reflect tonnes and ounces attributable to Premier, and mining depletion from 2018. Exploration success is continuing to support the replacement of mined reserves at Mercedes and South Arturo.
2018 MRMR Highlights


Pricing assumptions for gold and silver and other parametres are summarized in the “End Notes” at the end of this release. Note that any discrepancies in tables are be due to rounding. A detailed MRMR statement of all Premier’s properties is highlighted in Table 2 for Mineral Reserves and in Table 3 for Mineral Resources (exclusive of reserves).
“Premier has maintained a solid reserve and resource base in 2018 including updated statements at three of its property interests. We remain committed to the advancement of our portfolio through sustained exploration and a long-term strategic vision of growing production” commented Ewan Downie, President and Chief Executive Officer.
Premier’s two operating assets include Mercedes (100%) located in Sonora State in Mexico and South Arturo (40%) within the Carlin Trend in northern Nevada.
Mercedes Mine
Premier has owned Mercedes since October 1st, 2016. Mineral reserves at the mine stood at some 404,000 ounces of gold with an effective date of June 30, 2016. Since then, a total of 197,000 ounces of gold have been produced at Mercedes, of which 174,000 ounces of production is attributable to Premier. Proven and Probable reserves have been reduced by only 2.2% for 2.5 years of mining to some 395,000 ounces of gold. During 2019, Premier anticipates delineation drilling at Marianas to provide much of the resource to reserve conversion at Mercedes.
Tables 4 and 5 are detailed summaries of mineral reserves and mineral resources (exclusive of reserves) respectively on a “per ore zone” basis. Importantly, the Diluvio ore zone represents 52% of current mineral reserves at Mercedes and 38% of remaining measured and indicated resources. Mining at Diluvio represents a similar weighting in the mine plan for 2019 having efficiently transitioned to primarily longhole mining methods. An important component to replacing mined reserves at Mercedes in 2019 will be the successful delineation of the Marianas deposit that is located along the significant Mercedes ore trend. The Company has planned for 22,000 metres of delineation drilling at Marianas in 2019, which are coordinated with an extensive underground development program.
The mineral resources summarized in Table 5 represent a comprehensive review of 2018 results that imposed a stringent depletion of the resource. Removing sterilized areas from the mineral resources explains most of the tonnage or grade reductions as compared to 2017.


South Arturo Mine
Premier purchased its interest in the South Arturo property in mid-2015 with first production on August 1, 2016. At that time, the property hosted a mineral reserve (contained entirely within the Phase 2 pit) of 155,000 ounces of gold. Between 2016 and 2018, the Phase 2 pit realized total production attributable to Premier of some 167,000 ounces of gold and Premier estimates that some 11,000 ounces of gold currently remain stockpiled (ARSO and/or roaster) at Goldstrike from Phase 2 mining. Overall, this represents approximately 15% more ounces of production versus the original reserve estimate. Some 86% of current mineral reserves reside in the Phase 1 open pit that is currently under construction.


Underground mineral reserves and resources currently reside entirely within the El Niño area which remains open for expansion. Drilling at El Niño in 2019, from surface and underground, will focus on expanding reserves and resources. Attractive exploration targets such as East Dee, where delineation drilling will be completed in 2019, and several other target areas offer potential for further MRMR growth.
Premier’s two advanced exploration properties include Greenstone Gold (50%) located in the Geraldton-Beardmore Greenstone Belt, in Ontario and the McCoy-Cove Property in the Battle Mountain-Eureka Trend in northern Nevada. Only McCoy-Cove property is updated in this release.
McCoy-Cove Property
In May 2018, Premier released a Preliminary Economic Assessment (“PEA”) on the 100%-owned portion of the McCoy-Cove Property now referred to as the Cove Property. The PEA highlighted an NPV5 of US$143 million and an after-tax IRR of 48% for an underground mining plan of the Helen and Gap Zones. Included in the PEA was an updated MRMR statement that contains some 342,000 ounces of gold grading 11.22 g/t in the combined Measured and Indicated category. This represents a 50% increase in gold ounces versus the 2017 mineral resource estimate as a result of additional delineation drilling. In addition, some 1,322,000 ounces of gold grading 11.24 g/t has been estimated in Inferred resources. The remaining portion of the McCoy-Cove property currently contains no mineral resource. However, it is being actively explored by Barrick Gold Corporation under the terms of an Earn-in agreement which could see Barrick spend some US$22.5M to earn a 60% interest in the property. Since the beginning of 2018, exploration results from the McCoy-Cove joint venture and Cove Property highlighted a greater than 4 km footprint of Carlin-style chemistry that remains open at McCoy-Cove. Also, the Favret formation, a highly receptive limestone host of high-grade Carlin-style mineralization, remains largely untested on a property-wide basis.
Stephen McGibbon, P. Geo., is the Qualified Person for the information contained in this press release and is a Qualified Person within the meaning of National Instrument 43-101.
Premier Gold Mines Limited is a gold-producer with a respected exploration and development pipeline of high-quality precious metal projects in proven, accessible and safe mining jurisdictions in Canada, the United States, and Mexico. Premier remains focused on creating a low-cost, mid-tier gold producer through its two producing gold mines – South Arturo and Mercedes – as well as mine development opportunities at McCoy-Cove in Nevada and Hardrock in Ontario.
End Notes
For further information, please contact:
Ewan Downie, President & CEO
888.346.1390
Info@premiergoldmines.com
NT4
IBF4
![]()