Follow Us! Like Our Page!

Red Pine Continues to Expand Footprint of Gold Mineralization at its Wawa Gold Project

Press Release

Toronto, Ontario – April 23 , 2019 – Red Pine Exploration Inc. (TSX-V: RPX) (“Red Pine” or the “Company”) announces new drilling results from its delineation and exploration drilling in the Wawa Gold Corridor that includes the Surluga Deposit (“Surluga” or the “Deposit”). The Surluga Deposit1 is one of two (2) known resources, identified to date, on the large 6,519 hectares Wawa Gold Property, located near Wawa, Ontario.  These latest results will be included a revised NI 43-101 resource estimate for the Deposit that is expected to be issued in Q2 2019.

Quentin Yarie, President and Chief Executive Officer of Red Pine stated, “Our exploration and in-fill drilling program in the Wawa Gold Corridor continues to show that multiple zones of gold mineralization exist on the property. Our results indicate that these zones contain higher-grade mineralization. The results of our deeper drilling in the Jubilee Shear Zone confirm the down-dip extension of the structure and intersected a noticeable thickening of the shear zone. The results in the deeper holes drilled are typical of the “halo” of lower grade mineralization adjacent to the zones of higher-grade mineralization observed at shallower depths.”

Highlights from the discovered gold zones in the Wawa Gold Corridor (Table 1):

  • Discovery of high-grade gold in delineation holes of the Surluga Deposit:
    • Hole SD-18-258 contains 1.6 g/t gold over 41 m (true width) including 5.2 g/t gold over 3.1 m and 4.6 g/t gold over 6.2 m (true width).
  • New gold zones discovered in the Wawa Gold Corridor:
    • Near-surface zone of mineralization discovered in hole SD-18-256 contains 3.2 g/t gold over 6.5 metres including 9.0 g/t gold over 2.2 metres;
    • Minto B Shear Zone contains 2.1 g/t gold over 10.6 metres, including 3.7 g/t gold over 5.6 metres.
    • Hole SD-18-264 contains 0.7 g/t gold over 12.1 metres, including 3.2 g/t gold over 2.2 metres.
  • New results from infill drilling in the Jubilee Shear Zone:
    • SD-18-236 contains 1.9 g/t gold over 19.8 metres (true width), including 4.8 g/t gold over 5.8 metres (true width).
  • New results from deeper exploration drilling in the Jubilee Shear Zone Deposit:
    • SD-18-253 contains 3.5 g/t gold over 3.2 metres (true width) including 6.4 g/t gold over 1.7 metres (true width).
    • SD-18-262 contains 0.5 g/t gold over 49.8 metres (true width), including 0.8 g/t gold over 20.3 metres (true width).

The results of Red Pine’s 2018 exploration program continue to indicate the existence of many zones of gold mineralization in the Wawa Gold Corridor where, so far, resources have been estimated in two structures – 1) the Jubilee Shear Zone that hosts the Surluga Deposit, and 2) the Minto Mine South Shear Zone that hosts the Minto Mine South Deposit2.

Results from the 2016 to 2018 exploration drilling in the Wawa Gold Corridor have defined and continue to expand the geological footprints of the gold-bearing structures in the Wawa Gold Corridor. The recent 2018 exploration drilling results indicate that there is continuity in gold mineralization in the new gold-bearing structures. Results also suggest that additional infill and exploration drilling could convert the conceptual exploration targets into mineral resources.

Infill and confirmation drilling in the Jubilee Shear Zone

Red Pine’s 2018 diamond drill program, from July to early January 2019, targeted strategic areas in the Surluga Deposit where geological modelling suggested that high-grade mineralization would be discovered. Drilling results to date support the potential for the Surluga Deposit to host a higher-grade gold resource, accessible using the existing underground developments of the Surluga Mine. Recent drilling is also confirming that additional gold zones exist below the Jubilee Shear Zone (host of the Surluga Deposit) and that higher-grade mineralization can be found in those gold zones. The Company remains on track to deliver an updated resource estimation for the Surluga Deposit in Q2 2019.

Table 1. Highlights of the 2018 drilling results in the Jubilee Shear Zone and Wawa Gold Corridor

Hole From (m) To (m) Length (m)* Calculated true width (m) Gold (g/t) Gold Zone X Y Z Az Dip
SD-18-236 307.0 330.5 23.5 19.8 1.9 Jubilee Shear Zone 668492 5316349 378.8 234 52
Including
317.7 324.5 6.9 5.8 4.8
SD-18-250 232.4 235.4 3.0 0.9 New discovery 668331 5315818 362.8 289 78
329.4 361.6 32.2 29.6 0.5 Jubilee Shear Zone
Including
357.1 361.6 4.5 4.1 1.4
SD-18-253 301.0 305.0 4.0 3.2 3.5 Jubilee Shear Zone 668331 5315818 362.8 358 59
Including
301.0 303.1 2.1 1.7 6.4
359.8 362.4 2.6 2.1 3.1
SD-18-256 103.0 109.5 6.5 3.2 New discovery 668371 5315923 358 335 53
Including
105.0 107.2 2.2 9.0
244.2 254.8 10.6 2.1 Minto B
Including
247.2 252.8 5.6 3.7
276.4 284.2 7.8 0.4 New discovery
SD-18-258 64.9 84.8 19.9 0.4 Minto B 668169 5315848 351.4 313 77
80.0 84.8 4.8 1.3
225.2 269.8 44.6 41.0 1.6 Jubilee Shear Zone
Including
246.8 250.2 3.4 3.1 5.2
263.1 269.8 6.7 6.2 4.6
SD-18-259 286.2 336.1 49.9 42.0 0.4 Jubilee Shear Zone 668371 5315923 358 357 67
Including
316.2 318.3 2.1 1.8 1.9
333.5 336.1 2.6 2.2 1.2
SD-18-260 412.9 429.9 17.0 16.0 0.4 Jubilee Shear Zone 668385 5315732 374.4 315 72
Including
427.8 429.9 2.1 2.0 1.7
SD-18-261 271.6 317.2 45.6 41.7 0.5 Jubilee Shear Zone 668371 5315923 358 344 60
Including
288.7 290.7 2.0 1.8 1.8
307.3 313.5 6.2 5.5 1.8
SD-18-262 288.4 351.2 62.8 49.8 0.5 Jubilee Shear Zone 668371 5315923 358 5 62
Including
288.4 314.0 25.6 20.3 0.8
SD-18-263 126.0 132.9 6.9 0.7 Minto B 668355 5316062 370 240 51
339.0 357.2 18.2 15.8 0.5 Jubilee Shear Zone
SD-18-264 50.9 55.0 4.1 4.1 1.3 Jubilee Shear Zone 668245 5316786 354.4 292 55
167.6 179.7 12.1 0.7 New discovery
Including
177.5 179.7 2.2 3.2
344.7 350.1 5.4 0.8 Hornblende Shear Zone

*Results in the Minto B Shear Zone, Hornblende Shear Zone and newly discovered structures are presented as core length. Because of the complex superimposition of different tectonic fabric in the Minto B structure, additional drilling is required to define the geometry of the mineralized zones contained in the Minto B Shear Zone.

Figure 1. Plan map of drilling results

Wawa Gold Project Background

Since December 2014, Red Pine’s exploration work has involved the ongoing sampling of 42,000 m of historic core that was never sampled by previous operators of the project, and exploration drilling campaigns. To date, the Company has completed over 59,000 m of drilling and made four discoveries along the extension of the Surluga Deposit: the Surluga North Zone; the Hornblende-William Zone; the Minto Mine South Zone and; the Grace-Darwin Zone. These are part of the Wawa Gold Corridor, a gold-mineralization zone that extends for more than 5 kilometres.

Red Pine’s on-going exploration program is designed to potentially expand the size of the existing inferred gold resource and connect the other zones of gold mineralization along the Wawa Gold Corridor.

On-site Quality Assurance/Quality Control (“QA/QC”) Measures

Drill core samples were transported in security-sealed bags for analyses to Activation Laboratories Ltd. in Ancaster, Ontario. Individual samples are labeled, placed in plastic sample bags and sealed. Groups of samples are then placed into durable rice bags and then shipped. The remaining coarse reject portions of the samples remain in storage if further work or verification is needed.

Red Pine has implemented a quality-control program to comply with best practices in the sampling and analysis of drill core. As part of its QA/QC program, Red Pine inserts external gold standards (low to high grade) and blanks every 20 samples in addition to random standards, blanks, and duplicates.

Qualified Person

Quentin Yarie, P Geo. is the qualified person responsible for preparing, supervising and approving the scientific and technical content of this news release.

About Red Pine Exploration Inc.

Red Pine Exploration Inc. is a gold and base-metals exploration company headquartered in Toronto, Ontario, Canada. The Company’s common shares trade on the TSX Venture Exchange under the symbol “RPX”.

Red Pine has a 60% interest in the Wawa Gold Project with Citabar LP. holding the remaining 40% interest. Red Pine is the operating manager of the Project and is focused on expanding the existing gold resource on the property.

For more information about the Company visit www.redpineexp.com

Or contact:

Quentin Yarie, President & CEO, (416) 364-7024, qyarie@redpineexp.com

Or Mia Boiridy, Investor Relations, (416) 364-7024, mboiridy@redpineexp.com

IBF4

Loading

NationTalk Partners & Sponsors Learn More