TORONTO, May 14, 2026 – Talisker Resources Ltd. (“Talisker” or the “Company”) (TSX: TSK, OTCQB: TSKFF) is pleased to announce the updated Mineral Resource Estimate (“MRE”) at the Company’s 100% owned Bralorne Gold Project in southern British Columbia (“Bralorne Gold Project” or the “Project”). The MRE is reported in accordance with the Canadian Institute of Mining (CIM), Metallurgy and Petroleum Definition ‎Standards (2014) incorporated by reference in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”), and uses general procedures and methodologies that are consistent with industry standard practices, including those documented in the 2019 CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines.

Highlights of the Bralorne Gold Project MRE:

  • Combined Measured and Indicated Mineral Resources are estimated at 0.72 Mt at an average grade of 8.91 g/t gold. The MRE includes Measured Mineral Resources of 21,900 oz of gold at an average grade of 10.04 g/t gold and Indicated Mineral Resources of 184,400 oz of gold at an average grade of 8.80 g/t gold.
  • Inferred Mineral Resources are estimated at 11.23 Mt at an average grade of 8.73 g/t gold. The MRE includes Inferred Mineral Resources of 3,151,000 oz of gold.
  • A total of 141 orogenic veins that comprise the Project’s vein systems were included in the MRE. The MRE is exclusive of mined out material.

Terry Harbort, Talisker’s President and CEO, commented, “This updated MRE represents a step-change for the Bralorne Gold Project increasing our global resource by 100% and validates our long-held view of the quality and size of the Bralorne district. Congratulations to our Exploration and Resource modelling teams for delivering well beyond expectations. With our 105,000 metre drill program solidly underway, we look forward to our PEA and future resource updates and to achieving our corporate vision of developing a world class gold camp.”

Table 1-1 – Bralorne Gold Project Underground Mineral Resource Estimate, December 31, 2025

Area Resource Class Mass Average Grade Material Content
Au Au
Mt g/t oz
Mustang Measured 0.068 10.04 21,900
Indicated 0.333 9.49 101,700
M + I 0.401 9.58 123,600
Inferred 2.404 9.32 720,300
Olympus Indicated 0.319 8.07 82,700
Inferred 8.824 8.57 2,430,700
Total Measured 0.068 10.04 21,900
Indicated 0.652 8.80 184,400
M + I 0.72 8.91 206,300
Inferred 11.228 8.73 3,151,000

MRE Notes:

(1)    The mineral resource was estimated by Ben Eggers, MAIG, P.Geo. of SGS Geological Services, an independent Qualified Person as defined by NI 43-101. Eggers conducted a site visit to the Bralorne Property on January 30-31, 2026. The mineral resource was peer reviewed by Allan Armitage, Ph.D., P.Geo. of SGS Geological Services, an independent Qualified Person as defined by NI 43-101. Armitage conducted a site visit to the Bralorne Property on January 30-31, 2026.
(2)     The classification of the Mineral Resource Estimate (MRE) into Measured, Indicated and Inferred mineral resources is consistent with current 2014 CIM Definition Standards for Mineral Resources and Mineral Reserves. The effective date of the Bralorne Gold Project MRE is December 31, 2025. This is the close out date for the final mineral resource drilling database and the mining depletion models.
(3)      All figures are rounded to reflect the relative accuracy of the estimate and numbers may not add due to rounding.
(4)      All mineral resources are presented undiluted and in situ, constrained by continuous three-dimensional (3D) resource models (considered mineable shapes), and are considered to have reasonable prospects for eventual economic extraction. The mineral resource is exclusive of mined out material.
(5)     Mineral resources are not mineral reserves. Mineral resources which are not mineral reserves, do not have demonstrated economic viability. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated or Measured Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated or Measured Mineral Resources with continued exploration.
(6)     The Bralorne Gold Project MRE is based on a validated database which includes data from 2,260 surface and underground drillholes totalling 397,759 m completed between 1935 and December 2025 and 38,174 channels totalling 37,944 m completed between 1935 and December 2025. The resource database totals 138,268 assay intervals representing 139,291 m of drillhole data and 40,502 assay intervals representing 37,142 m of channel data.
(7)      The MRE is based on 141 resource models representing mineralized orogenic veins which comprise the Bralorne vein systems. 3D models of mined out areas with a 5 m buffer applied were used to exclude mined out material from the current MRE.
(8)      Grades for Au are estimated for each mineralization domain using 1.0 m capped composites assigned to that domain. To generate grade within the blocks, the inverse distance squared (ID2) interpolation method was used for all domains.
(9)       Average density values by deposit area of 2.67 to 2.72 g/cm3 were assigned to all domains based on a database of 509 samples.
(10)     It is envisioned that the Bralorne Gold Project deposits may be mined using underground mining methods. Mineral resources are reported at a base case cut-off grade of 2.3 g/t Au. The mineral resource grade blocks were quantified above the base case cut-off grade, below surface, below overburden, within the constraining mineralization resource models, and exclusive of mined out material.
(11)    The underground base case cut-off grade of 2.3 g/t Au considers metal prices of US$3,200/oz Au and metal recoveries of 93% for Au.
(12)    The underground base case cut-off grade of 2.3 g/t Au considers a mining cost of US$90.00/t rock and a processing, treatment, refining, transportation, and G&A cost of US$47.00/t mineralized material.
(13)    The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

Table 1-2 – Bralorne Gold Project Mineral Resource Estimate Sensitivity Table, December 31, 2025

Resource Class Cut-off Grade
(Au g/t)
Mass Average Grade Material Content
Au Au
Mt g/t oz
Measured 1.5 g/t 0.071 9.63 22,100
1.7 g/t 0.071 9.73 22,000
1.9g/t 0.070 9.80 22,000
2.1 g/t 0.069 9.95 21,900
2.3 g/t 0.068 10.04 21,900
2.5 g/t 0.067 10.17 21,800
3.0 g/t 0.062 10.67 21,400
5.0 g/t 0.043 13.70 18,900
Indicated 1.5 g/t 0.727 8.09 189,100
1.7 g/t 0.714 8.20 188,400
1.9g/t 0.694 8.39 187,300
2.1 g/t 0.675 8.58 186,000
2.3 g/t 0.652 8.80 184,400
2.5 g/t 0.626 9.06 182,400
3.0 g/t 0.567 9.72 177,200
5.0 g/t 0.372 12.78 152,800
Inferred 1.5 g/t 12.834 7.88 3,249,800
1.7 g/t 12.456 8.07 3,230,400
1.9g/t 12.059 8.27 3,207,400
2.1 g/t 11.672 8.48 3,182,500
2.3 g/t 11.228 8.73 3,151,000
2.5 g/t 10.791 8.98 3,117,300
3.0 g/t 9.678 9.70 3,018,800
5.0 g/t 6.341 12.75 2,598,900

Notes:

(1)    Underground mineral resources are reported at a base case cut-off grade of 2.3 g/t Au (highlighted). Values in this table reported above and below the base case cut-off grades should not be misconstrued with a Mineral Resource statement. The values are only presented to show the sensitivity of the block model estimate to the base case cut-off grade.
(2)     All values are rounded to reflect the relative accuracy of the estimate and numbers may not add due to rounding.

Qualified Persons

The mineral resource was estimated by Ben Eggers, MAIG, P.Geo. of SGS Geological Services, an independent Qualified Person as defined by NI 43-101. Mr. Eggers conducted a site visit to the Bralorne Gold Project on January 30 – 31, 2026 and has reviewed and validated the sampling, analytical and QA/QC data underlying the technical information disclosed herein. The mineral resource estimate was peer reviewed by Allan Armitage, Ph.D., P.Geo. of SGS Geological Services, an independent Qualified Person as defined by NI 43-101. Dr. Armitage conducted a site visit to the Bralorne Property on January 30 – 31, 2026.

The scientific and technical information contained in this news release has been reviewed and approved internally by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker’s Vice President, Resource Development, who is a Qualified Person as defined by NI 43-101.

Technical Report

A technical report for the Bralorne Gold Project and the MRE, prepared in accordance with NI 43-101, will be filed under the Company’s profile on SEDAR+ at www.sedarplus.ca within 45 days of this news release. Readers are encouraged to read the technical report in its entirety, including all qualifications, assumptions, exclusions and risks that relate to the MRE. The technical report is intended to be read as a whole, and sections should not be read or relied upon out of context.