Follow Us! Like Our Page!

Talisker Intersects 121.00 g/t Au over 1.00 m within 59.29 g/t Au over 2.10 metres, from the 2026 Bralorne Gold Project Resource Conversion Program

Press Release

TORONTO, April 07, 2026  — Talisker Resources Ltd. (“Talisker” or the “Company”) (TSX:TSK | OTCQB:TSKFF) is pleased to announce results from the initial 25 drill holes from early 2026, predominantly targeting dip and strike extensions in the major ore veins at its currently producing Mustang Mine.

Highlights from the initial 25 drill holes include:

  • SB-2026-001 – 13.60 g/t Au over 0.80 m within 4.96 g/t Au over 2.95 m on the 55 Vein
  • SB-2026-002 – 10.80 g/t Au over 0.80 m within 6.06 g/t Au over 2.85 m on the 55HW Vein
  • SB-2026-002 – 121.00 g/t Au over 1.00 m within 59.29 g/t Au over 2.10 m on the 276 Vein
  • SB-2026-002 – 9.76 g/t Au over 0.50 m within 5.87 g/t Au over 2.05 m on the 55 Vein
  • SB-2026-004 – 78.30 g/t Au over 0.65 m within 25.45 g/t Au over 2.25 m on the 55HW Vein
  • SB-2026-004 – 65.60 g/t Au over 0.50 m within 27.43 g/t Au over 2.05 m on the 55 Vein
  • SB-2026-006 – 32.70 g/t Au over 0.75 m within 9.83 g/t Au over 2.50 m on the 55HW Vein
  • SB-2026-007 – 7.25 g/t Au over 0.50 m within 5.80 g/t Au over 2.10 m on the 101 Vein
  • SB-2026-007 – 16.60 g/t Au over 0.65 m within 6.50 g/t Au over 2.50 m on the 55HW Vein
  • SB-2026-008 – 16.50 g/t Au over 0.50 m within 4.92 g/t Au over 2.55 m on the 55HW Vein
  • UB-2026-008 – 21.60 g/t Au over 0.80 m within 8.55 g/t Au over 2.05 m on the BK Vein
  • UB-2026-012 – 30.70 g/t Au over 0.88 m within 10.82 g/t Au over 2.60 m on the BK Vein
  • UB-2026-013 – 22.50 g/t Au over 1.00 m within 16.72 g/t Au over 3.00 m on the BK Vein

A total of eight surface diamond drill holes, comprising 3,188 metres of drilling, were completed from a single drill pad in the Bralorne West zone. In addition, underground drilling from one diamond drill bay at Mustang 1055 Level resulted in 17 diamond drill holes totaling 1,847 metres. The surface drilling is focused on infill drilling Bralorne West’s 101, 55 HW, 276, and 55 veins. The underground holes in this release were focused on infill drilling of the BK and BK-9870 vein to the east of the main Mustang workings.

Kyle Orr, Talisker’s Vice President Exploration commented, “Diamond drilling at Bralorne is off to a great start in 2026. We continue to see excellent gold grades and are especially excited about how the Bralorne West infill zone is shaping up. The new Bralorne West decline is about 200 metres away from our first underground drill bay in the Bralorne West zone. Putting an additional underground drill here will allow us to continue infill drilling this zone with increased efficiency.”

Two drills (one underground and one surface) are currently active on the project and have been operating continuously since early 2026. A third drill (underground) is anticipated to arrive in early to mid Q2 2026 and will be positioned in the Mustang Down ramp first to drill below the current resource on Alhambra, BK, and BK-9870, and then will move to the Bralorne West decline to continue delineation drilling of this zone above the 980 Level. Detailed geotechnical core drilling from surface in the Bralorne West zone is planned to begin in mid-April.

All drill holes in this release are located in the Mustang Mine and hosted in diorite intrusive and/or intermediate to felsic dykes. Major vein structures intersected are orogenic quartz-carbonate veins with banded sulfide septae. Crack-seal septae host fine-grained arsenopyrite and pyrite mineralization. Alteration halos consist of strong silica – sericite ± mariposite alteration with disseminated sulfides.

Read More

IBF4

Loading

NationTalk Partners & Sponsors Learn More